Installation // Southlake, TX
Shipping container pools in Southlake, TX
Our DFW-based crew handles the whole job across Southlake and its suburbs: design, permits, site prep, crane set, decking and the backyard around it. One team, one contract.
Site review + design
Permits + HOA
Pad + utilities
Crane set
Deck + landscape
Days, not weeks.
| Phase | Day 1 | Day 2 | Day 3 | Day 4 | Day 5 |
|---|---|---|---|---|---|
| Delivery + crane set | |||||
| Hookups + startup | |||||
| Decking + finish | |||||
Typical delivery-to-first-swim: 2–5 days. Finish work varies with your design.
- N-01
Every Southlake property has its own constraints. We review placement, grade, drainage, utilities, delivery access, and local requirements before recommending a design.
- N-02
Tight infill and alley-access lots are where container pools shine — we plan the crane pick in advance.
- N-03
Many neighborhoods have HOA review — we include it in the design phase so nothing stalls later.
Outside North Texas? We travel for installs statewide and ship pools anywhere in the U.S.
How shipping works →Is a shipping container safe to swim in?
Yes. We don't clean out an old container and fill it with water. Every pool starts as a new one-trip container, cut to height and rebuilt as a pool: a 3/16" steel plate floor on a welded steel tube frame, a steel tube cap around the top edge, and a seamless spray-applied polyurea waterproof liner. It's permitted and fenced like any other residential pool.
How long does a container pool installation actually take?
Once your site is prepped, installation typically takes 2–5 days from delivery to first swim — far shorter than the three to six months a gunite pool usually takes. The pool arrives largely finished from the fabrication shop, so on-site work is mostly crane placement, plumbing and electrical hookups, and decking.
Do I need a permit or HOA approval for a container pool?
In almost every Texas jurisdiction, yes — a container pool is treated like any other swimming pool for permitting and fencing purposes. We handle the permit paperwork as part of the project and will flag any HOA requirements during the design phase, before we ever schedule a crane.
READY TO GET STARTED?
Send your project details. A real person replies within one business day.
Designs, pricing and timelines are preliminary until a written agreement.